524 has been closed in. It has it's pretty blue wrapper on. The black in the front is where the rock will be going. Looking more and more like the house we picked. No shingles yet.
The white area in the front is covered in chicken wire for the stucco to go on. The rest of the blue will be covered like that also. The curved windows in the front are the kitchen area. We will have our small table there so we can watch the world go by out front.
The attic area above the living area is a network of ducts from the furnace (which is up there too) and from the air conditioner.
The shower in the master bath.. it has water in the base which is frozen!! I guess we aren't hooked up to the sewer yet, so they didn't drain it. it will be fun to have all that space.
The attic area above the living area is a network of ducts from the furnace (which is up there too) and from the air conditioner.
The shower in the master bath.. it has water in the base which is frozen!! I guess we aren't hooked up to the sewer yet, so they didn't drain it. it will be fun to have all that space.
1 comment:
WOW! That is amazing!
Post a Comment