Thursday, February 3, 2011

February 3rd, House update

We were pleasantly surprised today to see the stucco on the house. It was 18 degrees up in Georgetown today with a mighty wind blowing. Those poor workers that were outside were moving fast as they framed a house two doors down. We need some warmer weather to dry all of this so they can paint it. I don't know if the stonework goes on before or after they paint.

I was glad to see the garage door was on.
Inside the wall board was taped and spackled. looking good. I was concerned about the pipes freezing, but they reassured me that everything will be ok. This is looking towards the patio doors.


Out in the garage is a mighty pile of cupboards waiting to be installed. The little boxes on the right are tiles for the kitchen, entry and bathroom floors.


Behind the cupboard boxes are the inside doors in their frames. The box on the floor is the fold down ladder that goes in the ceiling in the garage.
This looks towards the front of the house. There is a pass through into the kitchen.


2 comments:

Carol said...

LOOKS SOOOOO GREAT!!!!

Moving right along.

Myrna & Bob said...

Thanks Carol. This whole process has certainly been a learning curve.