There she is, painted, guttered, rock trim in place, clean windows and ready for the touch up crew and the sod crew.
Saturday, February 26, 2011
Feb 25th Almost Done
Friday, February 18, 2011
2/18/2011 Looking Good
Such a nice feeling to come around the corner and see 524 all decked out in her new colors (bland as they are). I think the native plants will be a good accent. The stonework looks great. It is called rattlesnake. It helps to give it a little contrast. I hope we have good neighbors, because I think we could open a window and shake hands across the property line!!
Monday, February 14, 2011
Happy Valentine's Day
Well our gift to each other was finally settling on a contract and locking in an interest rate. I am glad that is over. We went up on Sunday after church to check on things and Bob put down insecticide before they start on the flooring. The changes in the last few days were:
Wednesday, February 9, 2011
More Progress 2/8/2011
It is hard to believe that they can get any work done when it is so cold, but the texture of the stucco is done. Now it has to dry enough so it can be painted. The outside looks more defined. Hopefully the stone will be added soon.
Friday, February 4, 2011
SNOW
We have been experiencing very cold weather and yesterday they predicted winter storms for last night. Austin got more ice than snow and we got about an inch of snow. But they closed the schools and many of the offices were closed because of the weather. We have had over 70 hours of below freezing weather. Needless to say we are getting alittle tired of this, after all we are in TX. This morning I heard voices outside and was given the invitation to come take pictures of snow angels. Who could resist!!
Ben was the first to plop down in the driveway.
Thursday, February 3, 2011
February 3rd, House update
We were pleasantly surprised today to see the stucco on the house. It was 18 degrees up in Georgetown today with a mighty wind blowing. Those poor workers that were outside were moving fast as they framed a house two doors down. We need some warmer weather to dry all of this so they can paint it. I don't know if the stonework goes on before or after they paint.
Out in the garage is a mighty pile of cupboards waiting to be installed. The little boxes on the right are tiles for the kitchen, entry and bathroom floors.
February 2nd Winter in Texas
Winter in Texas is variable. On Monday it was 80 degrees, with doors and windows open. That night an abrupt turn around. The wind turned and came out of the north with a vengeance. We could feel it throughout the night as the 5th wheel tossed around a bit. Brett called at 6:30 am and wanted to know if we were going out, because there was a tree across the drive. Fortunately we were not and this was the scene when we looked up the drive.
And down the driveway it went to be dealt with on a warmer day.
Subscribe to:
Posts (Atom)